Mold Manufacturing

Sand Casting Pattern & Core Box

Sand-casting patterns and core boxes for prototypes and low-volume production. Delivered in 7–15 days, they let a new design be validated at real scale before permanent tooling is committed.

Product Overview

Sand-casting patterns and core boxes for prototypes and low-volume production. Delivered in 7–15 days, they let a new design be validated at real scale before permanent tooling is committed.

What Makes This Part Reliable

  • Fastest route to a real metal part — 7–15 days for the pattern.
  • Ideal for validating design before permanent tooling investment.
  • Core boxes built to produce complex internal passages.

Typical Applications

Specifications

Part CodeMOLD03
Material / AlloyAluminium / wood pattern
Manufacturing ProcessPattern & Core Box Manufacturing
Application IndustryTooling
Typical Weight1 set
Dimensional Tolerance±0.2 mm
Surface TreatmentSealed · Painted
Dimensional StandardTool tolerance ±0.05 mm
MOQ1 set
Lead Time20–35 days depending on complexity
InspectionCMM verification report, T1 sample approval
Part CategoryMold Manufacturing
Drawing FormatSTEP / IGES / X_T / DWG / PDF — 2D & 3D both accepted

Values shown are typical for this part family. Send your drawing and we will confirm the exact alloy, tolerance and price for your application.

Process Flow

  1. RFQ & DFMEngineers review your drawing, wall thickness, draft and tolerances, then recommend the process.
  2. QuotationWritten quote within 24 hours — tooling, unit price and lead time.
  3. ToolingIn-house mold or pattern, checked against a mold-flow simulation before cutting.
  4. T1 SampleFirst article shipped with a CMM report for your approval.
  5. Mass ProductionStable process parameters, in-line inspection and full lot traceability.
  6. Machining & SurfaceCNC finishing, then shot blasting or the treatment you specify.
  7. Final InspectionCMM, spectrometer, X-ray, hardness and metallographic analysis.
  8. Packaging & ShipmentExport carton or crate with desiccant; DDP available on request.

Need Sand Casting Pattern & Core Box produced to your drawing?

Send a STEP file or a sketch and our engineers will reply with a process recommendation, realistic tolerance advice and a written quote within 24 hours.

Related Products

More from the Same Process Family

Other parts we produce with the same process route — send us a drawing and we will quote in 24 hours.